Project File:
Birkenhead inner ferry terminal
Client
Auckland Council
Location
Birkenhead, Auckland
Time Period
Completed: August 2012
The Project
Total Floating systems were contracted to design and build a new ferry terminal pontoon and gangway platform as part of the upgrade to the inner wharf.
Performance:
The project was completed within budget and on time, the ferry terminal was quickly put to use by Auckland commuters and the feedback from the council has been positive.Physical works:
Design and manufacture a 172 sqm concrete pontoon.Design and manufacture a steel and Hardwood timber fendering system.
Design and manufacture a steel platform.